All projects
Institutional and municipal
Marine bollards — Old Port of Montréal
Production run of structural marine bollards for the Old Port of Montréal quays.
The challenge
Replace mooring bollards on heritage quays. Each bollard must take high mooring loads and stand up to the river climate.
Our solution
Design validated in 3D, series fabrication in our LaSalle shop, hot-dip galvanizing, then coordinated installation on the quays. CWB-compliant welds, full traceability from batch to batch.
Materials and processes
- Galvanized structural steel
- CWB certified MIG welding
- 3D shop drawings
- On-site installation




